Kurobe Dam Landslide Protection Piling Project
Location: Kurobe Dam, Japan
Industry: Piling & Foundation Drilling
Hole Size: 18 to 23-7/8 inch (458 - 606 mm)
View Project
TGV Railway Electrification Project – Belgium
Location: Belgium
Industry: Piling & Foundation Drilling
Hole Size: 18 to 23-7/8 inch (458 - 606 mm)
View Project
Bridge Reconstruction Project
Location: Northern Province, South Africa
Industry: Overburden Drilling
Hole Size: 18 to 23-7/8 inch (458 - 606 mm)
View Project
Industrial Water Well Drilling Project
Location: Ojos De San Pedro, Chile
Industry: Water Well Drilling
Hole Size: 18 to 23-7/8 inch (458 - 606 mm)
View Project
Amtrak NE Corridor Railway Electrification Project
Location: Eastern USA
Industry: Overburden Drilling, Piling & Foundation Drilling
Hole Size: 24 to 30-7/8 inch (610 to 784 mm), 31 inch and larger (787 mm+)
View Project
NYC Subway Tunnel Project
Location: New York City, NY USA
Industry: Piling & Foundation Drilling
Hole Size: 24 to 30-7/8 inch (610 to 784 mm)
View Project
Otira Viaduct Bridge Construction
Location: Southern Alps, New Zealand
Industry: Overburden Drilling, Piling & Foundation Drilling
Hole Size: 24 to 30-7/8 inch (610 to 784 mm)
View Project
Natural Gas Exploration to Great Depths
Location: West Texas USA
Industry: Oil & Gas Drilling
Hole Size: 03-1/2 to 05-7/8 inch (89 - 149 mm), 06 to 09-7/8 inch (152 - 251 mm), 10 to 17-7/8 inch (254 - 454 mm)
View Project
Methane Gas Exploration
Location: Cheshire, United Kingdom
Industry: Oil & Gas Drilling
Hole Size: 03-1/2 to 05-7/8 inch (89 - 149 mm)
View Project
Gas Exploration Project
Location: West Virginia, Eastern USA
Industry: Oil & Gas Drilling
Hole Size: 03-1/2 to 05-7/8 inch (89 - 149 mm)
View Project